This HTML5 document contains 21 embedded RDF statements represented using HTML+Microdata notation.

The embedded RDF content will be recognized by any processor of HTML5 Microdata.

PrefixNamespace IRI
fn15schemahttps://w3id.org/framester/framenet/tbox/
n4https://w3id.org/framester/framenet/abox/fe/Duration_of_final_state.
rdfshttp://www.w3.org/2000/01/rdf-schema#
framehttps://w3id.org/framester/framenet/abox/frame/
rdfhttp://www.w3.org/1999/02/22-rdf-syntax-ns#
owlhttp://www.w3.org/2002/07/owl#
sthttps://w3id.org/framester/framenet/abox/semType/
xsdhhttp://www.w3.org/2001/XMLSchema#
n6http://premon.fbk.eu/resource/fn17-installing@
Subject Item
st:Duration
fn15schema:isSemTypeOf
n4:installing
Subject Item
frame:Installing
fn15schema:hasFrameElement
n4:installing
Subject Item
n4:installing
rdf:type
fn15schema:FrameElement owl:ObjectProperty
owl:sameAs
n6:duration_of_final_state
rdfs:domain
frame:Installing
rdfs:range
st:Duration
rdfs:comment
The Duration_of_final_state is the amount of time for which the Component is to remain part of the System. Per the suggestion of A. Briggs Geddis, Mr. McChord informed the Commission that a curtain drain could be installed and monitored for two months to try to lower the groundwater level in the proposed septic area.
rdfs:label
Duration_of_final_state
fn15schema:FE_coreType
Extra-Thematic Extra-Thematic
fn15schema:FE_name
Duration_of_final_state Duration_of_final_state
fn15schema:definition
<def-root>The <fen>Duration_of_final_state</fen> is the amount of time for which the <fen>Component</fen> is to remain part of the System. <ex>Per the suggestion of A. Briggs Geddis, Mr. McChord informed the Commission that a curtain drain could be <t>installed</t> and monitored <fex name="dur">for two months</fex> to try to lower the groundwater level in the proposed septic area.</ex></def-root> The Duration_of_final_state is the amount of time for which the Component is to remain part of the System. Per the suggestion of A. Briggs Geddis, Mr. McChord informed the Commission that a curtain drain could be installed and monitored for two months to try to lower the groundwater level in the proposed septic area.
fn15schema:hasSemType
st:Duration
fn15schema:FE_ID
8392
fn15schema:FE_abbrev
dur
fn15schema:FE_cBy
JKR
fn15schema:FE_cDate
2005-06-30T12:17:25+02:00
fn15schema:frameElementOf
frame:Installing